Petron Engineering bags two orders |
By e4p Correspondent, Wednesday, September 16, 2009, 16:39 Hrs [IST] |  |
0 Remark(s)
|
|
Category: Power Distribution | Tags: Petron Engineering Construction, Powergen Infrastructure, Tiroda Thermal Power Project | Share:  |
|
Petron Engineering Construction has bagged two orders with a cumulative value of Rs 154.42 crore.
The first order is from Powergen Infrastructure for erection and associated works of boiler and auxiliaries.
The second order is from Adani Power Maharashtra for the work of TG auxiliaries of Unit No 1 and 3 out of 3 x 660 MW Tiroda Thermal Power Project at Tiroda in Gondia district of Maharashtra.
Source : ProjectsToday
|
| |
|